There is no bad month, because any 12 months on the roof makes the same yearly total. Spring is the strongest time to install: you go straight into the long days, and you avoid the summer rush when installer lead times are longest. April to September makes about 70% of an Irish roof's yearly output.
Irish solar output swings hard with the seasons. A 4kWp south-facing system makes roughly 517 kWh in June but only 110 kWh in December, nearly a five-fold difference. Install in spring and you go straight into the strongest months. Install in December and the first few months bring modest output.
Timing changes the start, not the total
Any 12 months on the roof collects the same yearly output, about 3,800 kWh for a 4kWp system, whichever month you start in. What the install month changes is how fast the first returns show up: a spring install goes straight into the long days, so the first bills after installation show the biggest drop, while a winter install starts slowly and catches up by summer.
To understand the seasonal impact, here is the month-by-month generation profile for a typical 4kWp south-facing solar PV system in Ireland. These figures are typical modelled yields for a south-facing 4kWp system in Ireland (roughly 950 kWh per kWp per year):
| Month | Expected Generation (kWh) | % of Annual Total | Daily Average (kWh) |
|---|---|---|---|
| January | 125 kWh | 3.3% | 4.0 |
| February | 182 kWh | 4.8% | 6.5 |
| March | 315 kWh | 8.3% | 10.2 |
| April | 422 kWh | 11.1% | 14.1 |
| May | 505 kWh | 13.3% | 16.3 |
| June | 517 kWh | 13.6% | 17.2 |
| July | 494 kWh | 13.0% | 15.9 |
| August | 426 kWh | 11.2% | 13.7 |
| September | 334 kWh | 8.8% | 11.1 |
| October | 228 kWh | 6.0% | 7.4 |
| November | 141 kWh | 3.7% | 4.7 |
| December | 110 kWh | 2.9% | 3.5 |
| Annual Total | 3,800 kWh | 100% | 10.4 |
The data tells a clear story. From April through September, an Irish array produces roughly 70% of its annual output in just six months. October through March accounts for the remaining 30%. This is the fundamental reason why spring installation is optimal - you capture the entire high-generation season from day one.
Spring is widely considered the best time to install solar panels in Ireland, and for good reason. You apply online and wait for SEAI's letter of offer before any work starts; allow a few weeks for that and for installer scheduling, meaning if you apply in February or early March, your system will be installed and generating by April - just as the generation curve begins its steep upward climb. By installing in spring, you capture the entire April-to-September high-generation window in your first year.
Summer installation means your panels start generating at their maximum potential from day one. This is psychologically satisfying - you can see your inverter hitting its peak output within hours of being switched on. However, there are some trade-offs:
Autumn is a pragmatic time to install solar panels. Generation is declining but still meaningful - September alone produces 334 kWh from a 4kWp system, more than December and January combined. Installer availability improves as the summer rush subsides, and you may be able to negotiate slightly better pricing.
The main disadvantage is that you miss the entire summer peak. However, the SEAI grant does not expire at the end of the year, and panels generate electricity in every month. An autumn installation means you start collecting savings immediately rather than waiting until the following spring.
Winter is the least popular time for solar installation, and the reasons are understandable: short days, poor weather, and low generation. However, it is not as bad as many people assume:
If you install in January, by the time your system is fully operational (factoring in 4–6 weeks for grant approval and scheduling), it will be late February or early March - just as generation begins to climb. The "lost" generation from January and February is relatively small (approximately 275 kWh combined).
You apply for the SEAI grant online and must have the letter of offer before any work starts; how long that takes varies, so apply as soon as you have chosen your installer. After installation, your installer sends SEAI the completion paperwork and we book your post-works BER assessment; SEAI says to allow 4 to 6 weeks for payment once it has them all (longer if your home is picked for an inspection). Here is a typical timeline:
| Step | Duration | Cumulative Time |
|---|---|---|
| Get quotes and choose installer | 2–3 weeks | 2–3 weeks |
| Apply for SEAI grant, wait for the offer | Varies (allow up to 4–6 weeks) | 6–9 weeks |
| Schedule installation | 2–4 weeks | 4–7 weeks |
| Installation day | 1–2 days | ~7 weeks |
| Completion paperwork (installer) and post-works BER (we book it) | 1–2 weeks | ~9 weeks |
| Receive grant payment | 4–6 weeks | ~19 weeks (4 to 5 months) |
This means that if you start the process in early February, you could have your panels installed and generating by late April, with the grant payment arriving by June or early July. The total end-to-end timeline is roughly 4 to 5 months, which is why starting early in the year is so advantageous.
Every month you delay installing solar panels is a month of free electricity you are not getting. At a typical unit rate of about €0.35/kWh, even a modest winter month of 100 kWh used at home saves you about €35. Over a full year of waiting, a 4 kWp system's saving, about €920 on our estimate, is permanently lost - not borrowed, but lost forever.
Stop Waiting, Start Saving
The best time to install solar panels was last year. The second best time is today. Whatever month it is, starting the process now means your system will be generating sooner. Every day of delay is a day of missed savings.
Written by
Cal Chesters
Founder & Lead Installer, Solar Ireland
Over 10 years in the Irish solar industry. Cal started Solar Ireland to cut through the noise and give homeowners a straight answer on what solar is worth.
More about Solar IrelandThe numbers above are a typical Irish home. Yours depends on your usage, your roof and your day-night split. The analyser reads your actual bill and tells you.
Related to: Best Time of Year to Get Solar Panels in Ireland
Solar tips, SEAI grant updates, and honest advice for Irish homeowners. Newsletter sign-up is coming soon.
We respect your privacy - we will never share your details.