TAMS pays 60% on farm solar, but it ranks and selects: in Tranche 10 about one in ten solar applications was picked, per the Department of Agriculture. SEAI's doubled Non-Domestic Microgen Grant pays the lower of its kWp table or 45% of the invoice, up to €325,200, and describes no draw. It closes on 6 July 2027.
| TAMS solar (SCIS) | SEAI doubled grant (NDMG) | |
|---|---|---|
| Rate | 60% | Lower of the SEAI table or 45% of the invoice |
| Who | Farmers, through a TAMS 3 application | Businesses, farms, public bodies and non-profits, once per MPRN |
| Cap | €90,000 investment ceiling | Up to €325,200, systems up to 1,000 kWp |
| Selection | Ranked and selected: 10% of solar applications picked in Tranche 10 | No ranking or draw described on seai.ie |
| The catch | On-farm energy use only, from 7 March 2026 | New applications close 6 July 2027; letter of offer before any work |
| Source | gov.ie, Department of Agriculture, 3 March 2026 | seai.ie, Non-Domestic Microgen Grant |
Both on one system?
We are not saying you can or cannot use TAMS and the SEAI grant on the same system. Confirm with your adviser and with SEAI before you apply for either.
The Solar Capital Investment Scheme under TAMS 3 pays 60%, on an investment ceiling of €90,000 separate from the other TAMS schemes. Demand was high enough that the Minister for Agriculture, Martin Heydon, limited it. He said over 20% of the TAMS budget had gone on the solar measure alone, and from the tranche that opened on 7 March 2026 solar grant aid is limited to on-farm energy use (gov.ie, Department of Agriculture, 3 March 2026).
Tranche 10 closed on 5 December 2025 with 7,906 applications across TAMS and was run on ranking and selection. For solar, the Department put the selection rate at 10%. The Department has not said later tranches will run the same way, so check the current rules before counting on either outcome. The next TAMS tranche closes on 4 December 2026.
SEAI's Non-Domestic Microgen Grant covers the agricultural sector. For new applications from 6 October 2026 to 6 July 2027 it runs at an effective 45%: SEAI pays the lower of its kWp table or 45% of your invoice, up to €325,200, on systems up to 1,000 kWp (SEAI). SEAI's page describes no ranking or selection. After 6 July 2027 the doubled rate is gone for new applications.
| System | SEAI table value | Invoice needed to receive it in full |
|---|---|---|
| 20 kWp | €13,200 | €29,334 or more |
| 50 kWp | €25,200 | €56,000 or more |
On a lower invoice SEAI pays 45% of the invoice instead. Illustrative grant figures only, not a quote or a saving. The full table, VAT and tax relief are in our commercial solar grant guide, and the rate change itself is covered in SEAI doubled the business solar grant.
On most farms the big loads are milking, milk cooling, water heating, lighting and ventilation. Panels make power in daylight, and every unit the farm uses while the sun is up is a unit you do not buy. Exports earn only what your supplier pays under the Clean Export Guarantee. Both grants now point the same way: size the system for what the farm uses. Your bill shows the day and night split, and the farm bill analyser works from your own figures.
The Solar Capital Investment Scheme under TAMS 3 pays 60%, on an investment ceiling of €90,000. From 7 March 2026 the aid is limited to on-farm energy use, per the Department of Agriculture.
Nobody can say in advance. In Tranche 10 the Department selected 10% of solar applications. It has not said later tranches will run the same way; the next closes on 4 December 2026.
Yes. SEAI's Non-Domestic Microgen Grant covers the agricultural sector, once per MPRN. New applications made by 6 July 2027 get the effective 45% rate, up to €325,200.
No. Nothing is bought or started until SEAI's letter of offer arrives. After that you have 8 months to finish the job.
How we handle farm and business installs is on our business solar services page, and every grant band is in the SEAI commercial solar grant table. Start with your bill, then a 15-minute call, then the site survey.
Sources: SEAI, Non-Domestic Microgen Grant and the Department of Agriculture on TAMS 3 Tranche 10, read 12 November 2026.
Written by
Cal Chesters
Founder & Lead Installer, Solar Ireland
Over 10 years in the Irish solar industry. Cal started Solar Ireland to cut through the noise and give homeowners a straight answer on what solar is worth.
More about Solar IrelandSEAI pays up to €2,400: €1,800 for panels at 4 kWp, plus €600 with a battery of 5 kWh or more, and we guide you through it. Put your bill through the analyser and you will see the grant applied to a real system size for your house.
Related to: Farm Solar in 2027: The Doubled SEAI Grant or TAMS?
Solar tips, SEAI grant updates, and honest advice for Irish homeowners. Newsletter sign-up is coming soon.
We respect your privacy - we will never share your details.